In other words....we have a foundation!
Above is a picture looking into the basement. The far corner will be the rec room, the black pipe in the foreground is the bathroom and on either side of the bathroom are bedrooms (which will be unfinished for the time being). The rec room and bathroom took priority.
Here is a picture from the back corner of the house looking at our backyard and the view from our backyard. We were worried the yard wouldn't be big enough for the boys but after they agreed to move the house forward and flatten the backyard we aren't too worried anymore. The view is incredible as well and there won't be anything obstructing it.
Lastly, a picture of the 3 car garage. They laid down gravel and then they will pour cement when they do the basement floors. After that its framing!!!
No comments:
Post a Comment